Product Details

Bring beauty and sophistication into any bathroom with Pelican’s Cove Series. Comprised of cultured marble, this vanity sink delivers aesthetic appeal and durability. Its sleek, glossy surface matches well with a variety of styles. This specific model comes equipped with a built-in backsplash, providing a fluid transition between the countertop, sink, and wall. 

With its undermount installation, enjoy a seamless, sleek appearance in your space. ADA compliance ensures accessibility. While all Pelican products are built to last, a Limited Lifetime Warranty adds peace of mind for years to come. 

Available Resources

  • PL-O2522 Spec Sheet

    PDF
Sale Low Stock Out of Stock

PL-O2522

PL-O2522

25" x 22 1/64" x 7 19/32". Vanity Sink

Color: White
Side
Starting At
Regular price $245.99 USD
Regular price Sale price $245.99 USD
Sink Only
View full details

Product Details

Bring beauty and sophistication into any bathroom with Pelican’s Cove Series. Comprised of cultured marble, this vanity sink delivers aesthetic appeal and durability. Its sleek, glossy surface matches well with a variety of styles. This specific model comes equipped with a built-in backsplash, providing a fluid transition between the countertop, sink, and wall. 

With its undermount installation, enjoy a seamless, sleek appearance in your space. ADA compliance ensures accessibility. While all Pelican products are built to last, a Limited Lifetime Warranty adds peace of mind for years to come. 

Available Resources

  • PL-O2522 Spec Sheet

    PDF

Not sure where to start?

Talk To One Of Our Experts